Service · 03

Groundworks — the part nobody sees but everyone feels.

The base under a padel court does more work than any other component. We've been doing groundworks across the UK for twenty years, and we build padel bases the way a structural job deserves.

Groundworks is where most padel courts win or lose. Get the drainage, sub-base and concrete right and the court plays true for decades. Get them wrong and you'll be looking at standing water, surface lift and cracked slabs inside a handful of seasons.

We come from a construction and groundworks background, so this isn't a side service for us — it's the bit we've been doing longest, and the bit we care about most.

What's included

What we actually do.

01

Site clearance & strip

Vegetation removal, topsoil strip and disposal, level checks and grid setting out.

02

Excavation

Excavation to design depth with proper compaction testing and edge stability.

03

Drainage design & install

Falls, perimeter and sub-surface drainage tied into existing site systems or new soakaways.

04

Sub-base

MOT Type 1 or engineered sub-base laid and compacted in lifts, with CBR-checked stability.

05

Reinforced concrete slab

Steel-reinforced concrete base poured to tolerance, with proper cure and joint design.

06

Edge & fixings

Kerb edge detailing, post fixings and tolerances ready for the court structure to land cleanly.

Why it matters

Get this stage right or pay for it later.

An under-specified base is the most expensive mistake in UK padel right now. Once turf and glass are on top of a failing slab, putting it right means stripping the entire court back — a six-figure correction for the sake of saving a few thousand at the start.

Our bases are designed for the British climate: drainage that copes with the wet, slabs that don't move, and tolerances that let the courts above sit and play correctly.

Next step

Book a Site Feasibility Review

Tell us about your land, venue or club. We'll arrange a site visit, give you a straight answer on what's possible, and outline the realistic cost and timeline of a padel court build.